In what order would you do the following tasks involved in building a house?
1.Erect a frame
2.brick exterior
3.prepare site and pour concrete blocks
4.erect and tile roof
5.paint and tile the interior
6.install fittings and plumbing
7.line walls and ceiling
8.make and fit door and window frames
9.lay drains and septic system
10.make and install built in robes
11.stain and paint doors and windows
12.fit gutters pipes and connect plumbing
13.clean interior and site, remove rubbish and unused items

  1. Dave
    November 20th, 2009 at 22:18 | #1

    3,13,1,13,4,13,2,13,8,13,6,13,9,13,12,13…
    whats a built in robe?

  2. coolc
    November 21st, 2009 at 02:04 | #2

    3 9 1 8 4 2 6 7 12 11 5 13
    i did not use #10 because i am not familiar with the term “robe” i think it maybe the deck that the walls sit on in that case it would go between #9 & #1.